Current Competition Plans: Read Here

I'm currently doing a 3-day training split to off-set my weekend work doing concrete leveling out of town (temporary situation over summer). The split includes:

1: Primary Squat Day - Alternates between %-based competition squat, and squat variations based on RPE (SSB, front squat, pauses, etc). This also includes squat/deadlift assistance work.

2: Primary Pressing Day - Alternates between %-based and RPE-based pressing movements (bench press, floor press, etc). This also includes upper body assistance work.

3: Dynamic Squat Day & Full Body Assistance - Waves of dynamic effort squatting (typically in briefs), as well as a full-body assistance work circuit.

June 2018 Week 1 - Day 2 (Primary Pressing Day)

  • A. Close Grip Pause Floor Press - Triples up to 295x3

  • B1. Close(r) Grip Pause Floor Press - 5x5

  • B2. Seated Cable Rows - 5x10

  • C1. Overhead Rope Tricep Extensions - 4x12

  • C2. Supinated Bicep Curls - 4x10 each arm (slow and controlled)

*Pause floor press has been a great movement to keep strain off of my low back with all the heavy lifting I do on the weekends.

PeakPerformanceHeader